S03 · SOLSEE PMS(EMS)

SOLSEE PMS(EMS)

Safe, precise plant control on an AI-cloud foundation.

Engagement
On-premise build
SLA
100ms control
Recommended scale
Any capacity
SOLSEE PMS(EMS)
Why

Any plant configuration, one system.

Every site pairs PV, ESS, PCS and load differently, which makes unified control hard. SOLSEE PMS(EMS) handles them all, from PV-linked ESS to peak-shaving and factory energy management (FEMS), with one standard system regardless of configuration or capacity.
100ms

Control response

Reads power swings every 100ms and controls on-site directly.

80+

Inverters · PCS

Integrates major inverters, PCS and BMS over standard protocols.

2yr

Warranty

Two-year hardware warranty on HUB-PMS(EMS).

What we offer

What's included

Whatever the plant configuration — precise control and AI operations in one standard structure.
01

5 control modes

Switch between ESS charge/discharge, peak-cut, FEMS, manual and emergency.

02

PV-linked ESS

Links PV with ESS to optimize charge and discharge.

03

Peak-cut

Automatically discharges at peak hours to lower peak demand.

04

FEMS load management

Manages factory energy and load in one system.

05

AI operation diagnosis

Detects abnormal operating patterns and faults early.

06

AI forecast · report

Forecasts output and reports weekly to plan operations.

Process

Onboarding process

We analyze the site, then install and integrate in a standard structure to start operating.
  1. Step 01

    Site analysis

    Confirm PV·ESS·load and PCS·BMS configuration.

    Pre-consult
  2. Step 02

    Install HUB-PMS(EMS)

    Wall-mounted installation at the plant site.

    Install day
  3. Step 03

    Integrate PCS·BMS

    Connect the configuration over Modbus RTU/TCP·DNP3.

    Install day
  4. Step 04

    Set modes · operate

    Set the five modes to the site and start operating.

    Throughout operation
Our difference

Faster than a second.

Control on-site directly, in the same screen flow as monitoring.

Sub-second precise control

Reads and controls power swings every 100ms, running stably from small to large and complex configurations.

Local + cloud dual operation

The site controls locally and instantly while data backs up safely to the cloud — control holds even if the link drops.

Unified interface with PV monitoring

The same screen flow as SOLSEE monitoring — nothing new to learn.

Continuous remote SW updates

Improves features and stays current over OTA, with no site visit.

Lower demand charges

Peak-cut control automatically discharges at peak hours, lowering the contracted-demand base charge.

FAQ

Frequently asked questions

On control, configuration and security. Add other questions to your inquiry.
Isn't monitoring (SOLSEE) enough?
SOLSEE is for seeing; SOLSEE PMS(EMS) is for controlling. Together they flow from anomaly detection to automatic control.
Which plant configurations are supported?
PV-linked ESS, peak-cut and FEMS in a standard structure, regardless of capacity.
Does control stop if the link drops?
Local control continues on-site while data backs up to the cloud — a dual-run structure.
How is control access secured?
TLS 1.2/1.3 and VPN, plus two-factor authentication on control commands.
Let's talk

Control your plant safely and precisely.

Share your generation, storage and load setup and we'll propose a tailored control design.